Southern Tier TwinPath Lift
- By Hanes Supply
- Jun 20, 2004
This 40,000 pound Twin-Path sling lift for this bridge was with in the Southern Tier of New York. There were three decks weighing 40,000 pounds each. Each of the three decks were 10' wide by 22' long and had to be lifted, rotated and lowered into place to build this bridge. This was completed in only three hours.